Read the case given below and answer the questions given at the end.
CASE STUDY – 1
The table below gives details about the various tasks in assembly operation.
Questions
(a) Explain the heuristic steps involved.
(b) Find the theoretical minimum cycle time.
(c) Find the theoretical number of work stations.
(d) Assign tasks to the work stations using the LOT rule.
(e) Calculate the efficiency of the assembly line.
(f) Determine the balance delay